Saturday, April 17, 2010

Week2, 13th April

I have been involved in installing the ventilation motor for the gas turbine hall. It is required to climb up the roof and hence, it was a little bit scary. After take time to settle, I am fine with the condition. The motor is taken up by the crane that rent by the plant. It is required to install 6 ventilation units, but due to the size of the crane that can’t reach the part of the hole, we have just finished installed 3 units. The other technicians that involved is abang razak, abang Fadzli, Mr. Tan and abang Adib.