Circulating water pump 1A had been left unused since November last year. Repairment had been made and the repaired shaft was installed back. All the technician from ECNI department busy with their job and i was asked to help when they needed.
In the pump hall, they also pump out the mug from the underground since it had been left unused for a long time. The installation process continue to the next day as it is a complicated system.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment