I followed abang Suhaimi, block operator, to do the pump changeover at STG. The pumps that need to do the changeover are demin water transfer pump, closed cycle circulating water pump, service water pump, condenser extraction pump, gland steam condenser exhauster, hydraulic pump, lube oil pump and seawater booster pump.

This activity will be done weekly so that the pump can extend its working period. The main reason is to test the standby pump availability so that when in emergency, it is still functional.