before installing the pump back at water treatment plant
Wednesday, May 26, 2010
Week 7, 21st May
After finish repair the shaft, connection between the sleeve bearings is screw and the new shaft is being installed. The spacers that installed at the top of the shaft then are coupled with the motor. After all the work had done, we installed the pump back to the water treatment plant there.
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment