Sunday, May 9, 2010

Week 4, 29th April

The PM that needs to do today is GT 1&2 local temperature gauge inspection. The procedure is almost same with the PM that had done yesterday.

In the evening, I was given an assignment by Sri Daran. I need to find out the ANSI code for the protection relay that used in the plant. ANSI stand for America National Standard Institution that provide the code for all the protection relay.

No comments:

Post a Comment