Wednesday, May 26, 2010

Week 5, 7th May

I followed Mr. Tai to do the CCTV inspection PM. We need to check from the control center room to see whether all the function is ok. If the screen is blurring, we need to note down the number of CCTV and clean it later.

After finish the PM, all the CNI technician went to the boiler building to install the motorized actuator.

Abang Azim is installing the motorized actuator at boiler drum