Friday, April 23, 2010

Week 2, 15th April

Holiday for Malacca state...wakaka

Saturday, April 17, 2010

Week2, 14th April

En. Sharif explained to me how the power plant is operated and the function of a tap changer in the transformer. it is a good additional knowledge to me.

The PM that needs to do today will be carbon brush PM inspection. The instruction is check carbon brush and air filters. The carbon brush needs to be replaced when the measurement is less than 60mm. A normal carbon brush is 100mm long.

Abang Fadzli is taking out the old carbon brush

Abang Fadzli is installing the new carbon brush

On the left is the new carbon brush while on the right is the used carbon brush

Due to the installation of ventilation fan yesterday, the PM for water treatment plant motor PM is done today. It is required to check the on load current, insulation resistance, bearing vibration and body temperature.

Besides the PMs, the condenser fan motor for air condition 1B at center control room also not function. Hence, we need to go to do the checking. Further checking had been done and found out that the condenser 1 motor winding is short circuit and wire for condenser 2 that connect to neutral is disconnected. After the adjustment and install the new motor, both the condenser is functioning.
Mr. Tan is connecting the wire with the neutral ground wire

Abang Fadzli and Mr. Tan are installing the new motor for condenser 1

Week2, 13th April

I have been involved in installing the ventilation motor for the gas turbine hall. It is required to climb up the roof and hence, it was a little bit scary. After take time to settle, I am fine with the condition. The motor is taken up by the crane that rent by the plant. It is required to install 6 ventilation units, but due to the size of the crane that can’t reach the part of the hole, we have just finished installed 3 units. The other technicians that involved is abang razak, abang Fadzli, Mr. Tan and abang Adib.


Week2, 12th April

Today the job will be dealing with one checking and preventative maintenance. It is reported that the center control room air condition 1B tripped off after started and hence we need to check the control circuit and compress motor. I followed abang Razak to do the checking and the motor is in good condition.

Next is the steam turbine motors PM inspection. There are 2 inspections, general electrical and general physical inspection. For the electrical inspection, we checked for the on load current while for the physical inspection, we checked the bearing vibration and body temperature for the motor. There are 4 types of vibration need to be checked, that are non-driving end (NDE) X and Y axis and driving end (DE) X and Y axis. Each of them must be measured and the reading is recorded.

Week 1, 9th April

There are 2 PMs to do today, emergency diesel generator panel and fire diesel engine battery. For EDG, I and Mr. Tan do the visual inspection general cleaning and local panel battery inspection.

For diesel engine battery, we also do the same procedure. Besides that, we are required to take the reading for SG and voltage of the battery. The total voltage for a battery bank is around 24-27V.

In the evening, Mr. Sharif, supervisor of ECNI department, asked us to the control room to show how to switch on the water pump. Circuit breaker SF6 is used for 6.6kV and 415V circuit. When an accident occurred, circuit breaker is used to break the circuit.

The function of a differentiator of current is to check then three phases current is balanced or not. If it is not balance, it will sense by the current differentiator and circuit tripping will occurred.

The pump 1A is tested at the evening. Free running testing is used and after no error occurred, the connection with the shaft is connected and another testing is done. The vibration for the water pump after the repair had reduced.

Jockey pump

Diesel pump


Friday, April 16, 2010

Week 1, 8th April

Circulating water pump 1A had been left unused since November last year. Repairment had been made and the repaired shaft was installed back. All the technician from ECNI department busy with their job and i was asked to help when they needed.

In the pump hall, they also pump out the mug from the underground since it had been left unused for a long time. The installation process continue to the next day as it is a complicated system.

Week 1, 7th April

In the morning, i followed Mr. Tan to the gas turbine hall for gas turbine motor preventative maintainance (PM). In the control room, Mr. Tan explained to me that the code 88 is for motor system while code 23 is for heater system. The insulation resistance must be larger than 2M ohm and winding ohmic value must be balanced so that the system is safe.

In the evening, I followed abang Razak to circulating water pump hall to further observed their work.

Circulating water pump system description


The contractors are disassembling the pump