Thursday, June 24, 2010
Week 12, 25th June
Monday, June 21, 2010
Week 12, 23rd & 24th June
Week 12, 21st & 22nd June
Purchasing procedure is also explained to us so that we have the clear idea of how a stock is purchased.
Week 11, 18th June
Friday, June 18, 2010
Week11, 17th June
Week 11, 16th June
For the electrolysis process, the seawater booster pump will pump the seawater to the strainer for filter purpose. The seawater then will undergo the electrolysis process and the gas hydrogen will stored in the degasifier tank.
Week 11, 15th June
The cation exchanger and anion exchanger needed to regen every 350m3 of usage while mixed bed exchanger is every 4500m3
The regeneration of the anion exchangers requires caustic soda (sodium hydroxide). During the regeneration, warm sodium hydroxide at 50’C is required; hence the regeneration water heater is used to supply demineralized water at 82’C to the water blender which provides 50’C water to the caustic dilution.
The regeneration of the cation exchangers requires sulfuric acid. The supply of 98% sulfuric acid is stored in demineralizer sulfuric acid storage tanks.
Week 11, 14th June
Firstly, service water is fed to the carbon filter. The influent water is passed through a column of activated carbon to remove the major part of the organic matter and residual chlorine.
Then, the water is routed to the cation exchanger packed with a column of strong acid cation, exchange ion resin in the hydrogen form.
The cation effluent is then passed through a strong base anion inside the anion exchanger. The hydrogen ions from the cation resin neutralized the hydroxide ions from the anion resins and yield pure water.
The demineralized water is then passed to the mixed bed exchanger which contain a mixture of anion exchanger and cation exchanger to further polish the water before the water is discharged to demineralized water storage tank.
Week 10, 11st June
In the evening, there is a knowledge sharing session conduct by Amer (mechanical technician). He shared his experience about overhauling shutoff gas valve with us. This work will be done once a year during the outage session. Before installing the valve, they need to measure the valve can sustain how much pressure. The minimum pressure is about 25bar.
Week 10, 10th June
The heart of Voiths’ hydrodynamic torque converter is its hydraulic circuit; consisting of a pump, turbine, and a guide wheel with adjustable guide vanes. This is combined in a common housing filled with hydraulic oil.
The mechanical energy of the motor is converted into hydraulic energy through the pump wheel. In the turbine wheel the same hydraulic energy is converted back into mechanical energy and transmitted to the gas turbine/generator shaft.
The adjustable vanes of the guide wheel regulate the mass flow in the circuit. At closed guide vanes (small mass flow) the power transmission is at its minimum. With the guide vanes completely open (large mass flow), the power transmission is at its maximum.
Week 10, 9thJune
The process of purging stop when the turbine speed drops to 9% of the full speed. The function of purging is to drain out all the combustable gas from combustion compartment until exhaust compartment.
The process of firing starts after the purging until the turbine speed reach full speed.
Turbine speed trend
Week 10, 7th@8th June
Vision – The group envisions itself to be a global player in the energy and energy related business.
Mission – the group’s mission is to enhance shareholder return.
For the Quality Policy & Objective of the plant, the group is committed to be efficient and responsible by ensuring high standards in Quality and achieve full customer’s satisfaction by making ‘Quality A Way of Life’.
Week 9, 4th June
From Nooter Eriksen Operating manual, I learnt that recirculation pump on HP and LP economizers are use to increase the inlet feedwater temperature. It is required during the distillate oil as fuel. Condensation of acid can occur and corrodes the tubes of economizer if the temperature is low.
Week 9, 3rd June
Week 9, 2nd June
Week 9, 1st June
I participated in the steam turbine auxiliaries weekly changeover. As last week I followed patrolman, this week I will be at control center room monitor the changeover. Abang Azmi, SBO, let me to handle the changeover work under his supervise. I need to communicate with Nazirin (BO) to make sure that every pump is function able when I activate the standby pump. Once the pump is running, then the running pump will be deactivated. This process is repeated for every changeover pump.
Week 9, 31st May
I followed abang Fadzli, patrolman to do the gas turbine auxiliaries changeover. Before the changeover begins, abang Fadzli take down the suction pressure discharge pressure abd the expansion tank level for cooling water pump. After the changeover, the readings also need to take down. The following changeover is continuing with turbine compartment ventilation fan and distillate forward pump.
Then, abang Fadzli brought us to activate online water wash to decrease the turbine temperature so that the load will increase.
Week 8, 27th May
Abang Azmin is doing the EDG test run