Friday, June 18, 2010
Week 11, 14th June
Firstly, service water is fed to the carbon filter. The influent water is passed through a column of activated carbon to remove the major part of the organic matter and residual chlorine.
Then, the water is routed to the cation exchanger packed with a column of strong acid cation, exchange ion resin in the hydrogen form.
The cation effluent is then passed through a strong base anion inside the anion exchanger. The hydrogen ions from the cation resin neutralized the hydroxide ions from the anion resins and yield pure water.
The demineralized water is then passed to the mixed bed exchanger which contain a mixture of anion exchanger and cation exchanger to further polish the water before the water is discharged to demineralized water storage tank.
Week 10, 11st June
In the evening, there is a knowledge sharing session conduct by Amer (mechanical technician). He shared his experience about overhauling shutoff gas valve with us. This work will be done once a year during the outage session. Before installing the valve, they need to measure the valve can sustain how much pressure. The minimum pressure is about 25bar.
Week 10, 10th June
The heart of Voiths’ hydrodynamic torque converter is its hydraulic circuit; consisting of a pump, turbine, and a guide wheel with adjustable guide vanes. This is combined in a common housing filled with hydraulic oil.
The mechanical energy of the motor is converted into hydraulic energy through the pump wheel. In the turbine wheel the same hydraulic energy is converted back into mechanical energy and transmitted to the gas turbine/generator shaft.
The adjustable vanes of the guide wheel regulate the mass flow in the circuit. At closed guide vanes (small mass flow) the power transmission is at its minimum. With the guide vanes completely open (large mass flow), the power transmission is at its maximum.
Week 10, 9thJune
The process of purging stop when the turbine speed drops to 9% of the full speed. The function of purging is to drain out all the combustable gas from combustion compartment until exhaust compartment.
The process of firing starts after the purging until the turbine speed reach full speed.
Turbine speed trend
Week 10, 7th@8th June
Vision – The group envisions itself to be a global player in the energy and energy related business.
Mission – the group’s mission is to enhance shareholder return.
For the Quality Policy & Objective of the plant, the group is committed to be efficient and responsible by ensuring high standards in Quality and achieve full customer’s satisfaction by making ‘Quality A Way of Life’.
Week 9, 4th June
From Nooter Eriksen Operating manual, I learnt that recirculation pump on HP and LP economizers are use to increase the inlet feedwater temperature. It is required during the distillate oil as fuel. Condensation of acid can occur and corrodes the tubes of economizer if the temperature is low.



